  • Upon request from the Ministry of Agriculture and Rural Affairs İstanbul Regional Management, we carried out a project in Prince’s islands...

    More>>

  • Between 8th and 28th March 2014, we have successfully performed the monitoring of the lowering of caissons under water...

    More>>

  • Our company has included a Seaeye Falcon model ROV to it's inventory on January 4th 2014.

    More>>

  • Our company has successfully completed the Surveillance and Maintenance tasks of 110 km long 32’’ diameter natural gas pipeline of BOTAS spanning...

    More>>

  • Our company has successfully completed the Surveillance and Maintenance works of 9,6 km long 8’’&6’’ natural gas transfer pipelines of IGDAS that starts...

    More>>

  • Our company has laid 4200 m long (in total) Submarine Fiber Optic Cable of Turknetiletisimhizmetleri A.S in golden horn, between Baltalimani...

    More>>

OUR REFERENCES

OUR REFERENCES

Start Date

Company

The Job Definition

Finish Date

05/2014

Ministry of Agriculture and Rural Affairs

Finding and removal of fishnets around Prince’s islands

05/2014

03/2014

STFA

Monitoring of the caisson lowering for Izmit Bay Bridge Construction

03/2014

09/2013

İGDAŞ

Prince’s islands steel natural gas pipeline Heybeliada leakage check (upon request)

09/2013

09/2013

Turknet

Golden Horn Fiber Optic cable sea crossing

09/2013

09/2013

İGDAŞ

Prince’s islands steel natural gas pipeline surveillance

09/2013

08/2013

ARAS

İzmitBay bridge project search for the missing anchor and chain

08/2013

08/2013

KörfezDenizcilik

İzmitBay bridge project search for dropped concret block and removal

08/2013

07/2013

STFA

İzmitBay bridge projectfooting area search for ths stuck pipe and removal (diver)

07/2013

07/2013

STFA

İzmitBay bridge projectfooting area control and surveillance work

07/2013

01/2013

Vodafone

İzmitFiber Optic Cable sea crossing

01/2013

12/2012

Vodafone

Dardanel strait fiber optic cable sea crossing

12/2012

10/2012

Turknet

Bosphorus Triple fiber optic cable sea crossing

10/2012

07/2012

BOTAŞ

Marmara and İzmitNatural gas pipeline sea crossing

05/2013

09/2011

Türk Telekom

Golden horn area cable line Surveillance and maintenance work

10/2011

4/2011

VODAFONE

Bosphorusfiber optic cable crossing

4/2011

3/2010

İGDAŞ

Natural gas pipeline control surveillance and maintenance work removal and relocation of sample plate

03/2010

1/2009

ASELSAN

Underwater surveillance work with ROV and Diver

1/2009

11/2008

TPAO

Northern Marmara Naturalgas platform NDT surveillance cleaning (300m3 barnacles)Surveillence and cleaning of 4 buoys

12/2008

11/2008

UNİMAR

MCW Return line inside and outside (500mt) MCW arrival line surveillance and cleaning. Buoy surveillance replacement of chains.

11/2008

07/2008

İGDAŞ-İSTANBUL GAZ

Dragos-Büyükadagas pipeline removal of two parts 12-15 ms.

7/2008

5/2008

MEMOREX

2800mt. D/FO cable Darıca-Yalova, 1800+2000mt Üsküdar - Kabataş andKanlıca-Baltalimanı Total 1650 metres cable armorplacementi

5/2008

4/2008

T.P.A.O.

Protection of Ayazlı pipeline with special designed concrete blocks and sand bags (50-85 meters depth)

05/2008

3/2008

DETEK

Sarayburnu-Salacak 4 lines cable laying.

3/2008

1/2008

T.P.A.O.

Removal and replacement of disordered pipeline from 50 mts depth with mix gas/deep water dive location Akçakoca/Blacksea region Ayazlı petrol platform to shore.

2/2008

07/2007

T.P.A.O.

Removal and replacement of disordered pipeline from 70 mts depth with mix gas/deep water dive location Akçakoca/Blacksea region Ayazlı petrol platform to shore.

09/2007

04/2007

ÖZTAŞ – PEKER İŞ ORTAKLIĞI

Placement and testing of Karabiga/Şarköyarea, “Turkey-Greece natural gas pipeline phase 2”fiber optic underwater cable.

07/2007

04/2007

TOREADOR

TURKEY

LİMİTED

Akçakoca/Blacksea regionAyazlı-ÇayağzıShore gas production facility 1.500 mt.long 6” diameter discharge pipeline installation and testingı.

 

 

08/2007

09/2006

VALENTINE

MARITIME

(GULF) LTD

TPAO and TOREADOR TURKEY LİMİTED’s ,Akçakoca/Blacksea region, Natural gas production platform to shore facility 8600+3200=11800 mt., Ø 12” Natural gas pipeline construction deepsea mix gas dives, escorting services, surveillance services, burying of pipeline and supporting SAT system

01/2007

08/2006

SAVTEKSAN

SAVUNMA

TEKNOLOJİSİ

A.Ş.

Calibration termination control and maintenance of DF/O Cable (Hydrophone andAmphilicator)station.

Naval ships bottom check and surveillance recordings at İSTANBUL TERSANESİ KOMUTANLIGI.

08/2006

07/2006

TOREADOR

TURKEY

LİMİTED

Açakoca/Blacksea region, 60-71 mt. deep sea mix gas dives for template placement and video surveillance

07/2006

05/2006

UNİMAR ENERJİ YATIRIM A.Ş.

MCV and Outlet pipelines andsiphonepit’s videorecordings and periodical maintenance works. (Sultanköy/Marmara Ereğli)

05/2006

05/2006

TOREADOR

TURKEY

LİMİTED

Açakoca/Kdz. region, 62 mt. deep sea mix gas dives for template placement and video surveillance

05/2006